Sunday, 3 August 2014

User manual for “Source List”




Maintain Source List                 ME01


Purpose
A source list specifies all the allowed sources of supply of a specific material for a Plant.  It also indicates the validity period for which each the sources can be used
Trigger
Qualification of a vendor to supply specific materials or services for a plant (i.e. adding a supplier to an approved manufacturer list).
Prerequisites
Material, Plant, Valid from Date, Valid to Date, Vendor, Purchasing organization,
Menu path
Use the following menu path(s) to begin this transaction:
l  Logistics>Materials Management>Purchasing>Master Data>Source List>Maintain  go to the Maintain Source List  initial screen.
Transaction Code
ME01
Helpful Hints
l  Press F1 for Help
l  Press F4 for getting input values
l  R – Required
l  C – Conditional
l  R – Optional

Procedure

1.1.        SAP Easy Access




Fill All Required (R) filled in Item view and press Enter:

Field Name
Description
Req/Opt/Con
User Action and Values
Comments
Material
Material Master Number
R
Material master number known or via match-code

Plant
Receiving Plant
R
Enter receiving plant number







1.3.    On Screen “Maintain Source List”: Overview Screen


Press Enter:

Field Name
Description
Req/Opt/Con
User Action and Values
Comments
Material
Material Master Number
R
Defaults from Initial Screen

Plant
Receiving Plant
R
Defaults from Initial Screen

Valid From
Date vendor starts being a valid source
R
Enter the date

Valid to
Dates vendor stops being a valid source
R
Enter date

Vendor
Vendor name / number
R
Enter the known vendor number or search via match-code

Pur. Org
Purchasing Organization
R
Enter Purchasing Organization code

PPI.
Shipping Plant
O
Enter if appropriate
cannot be the same as Receiving Plant
OUN
Order unit
O
Enter unit of measure for ordering

Agreement
Contract/Scheduling agreement
O
Enter Outline agreement number if applicable

Item
Item number
O
Agreement  item number if applicable

FIX
When this indicator is on, this vendor will be the preferred source of supply, during the validity period
O
Indicator button on/off
Only one vendor can be identified as fixed during each validity period.
BLK
When this indicator is on, this vendor will be unavailable (blocked) as a source for this material
O
Indicator button on/off

MRP
Source list usage in Materials Planning & Control
C
Choose from the pull-down menu.

MRP Area
MRP Area for which material requirements planning should be carried out separately
C
Choose from the pull-down menu.


1.4     Click on the  save folder or hit Control + S.

Result

You have Maintained Source list

No comments:

Post a Comment